Present at the 12th “Colloque National Eolien” in Paris, Qair Group COO Charles Lhermitte signed with ENERCON the repowering of the Thykkvibaer wind farm, the oldest of the only two wind farms in the country, which was bought and dismantled earlier this year to be repowered in the second half of 2023 with E44 900-kW turbines.
With dimensions very close to the dismantled wind turbines in order to respect the initial building permits, theses Enercon wind turbines were selected for their proven resistance and ability to respond to the extreme climatic conditions of the site.
This repowering is a great opportunity for Qair to plan the construction of much larger wind farms within the next two years and the signature of our first energy supply contract in the country.