Contact us
Élysée Palace

Qair joins French president at the Élysée Palace for Choose France summit

Ahead of Eolmed’s inauguration, France’s flagship floating wind project, and first green hydrogen molecule produced by Hyd’occ

Paris, France – November 18, 2025 – Louis Blanchard, CEO of Qair, attended the closing dinner of the Choose France Summit’s “France Edition” at the Élysée Palace, alongside French President Emmanuel Macron, CEOs of France’s largest industrial groups, and government officials.

On this occasion, Qair announces two upcoming milestones for France’s energy transition:

These projects position Qair as a key player in France’s energy sovereignty and reindustrialization, with a strong local footprint in Occitanie and a pan-European offshore wind pipeline of 8 GW under development, including 1 GW in Scotland, Eolmed in France, and projects in Spain and Portugal.

 

Two Flagship Projects for France’s Energy Future

Eolmed

30 MW capacity

80% Made in France and 100% Made in Europe

Deployment of a French industrial floating wind sector

Inauguration scheduled in the coming weeks

Installation of the nacelle for one of the three wind turbines in the Eolmed offshore pilot farm project led by Qair

Hyd’Occ

France’s largest green hydrogen plant

First green hydrogen molecule to be produced in 2025

Five distribution stations, with two successfully deployed in 2025

Hyd’Occ, France’s largest green hydrogen plant.

Reindustrialization and Energy Sovereignty: How Eolmed and Hyd’Occ Address France’s Energy Challenges

These projects align with the country’s strategy for reindustrialization and energy sovereignty. Through Eolmed and Hyd’Occ, Qair is helping transform Port-La Nouvelle into a major hub for the energy transition in the Mediterranean, supporting Occitanie’s ambition to become Europe’s first positive-energy region. The port, equipped with dedicated infrastructure (40 hectares, two 200-meter quays, and a storage basin for floaters), is already hosting the construction of Eolmed and another 30 MW pilot farm, paving the way for a 250 MW commercial wind farm by 2028. Backed by €800 million in investments from the Occitanie Region, these projects position the site as a key industrial hub for floating wind and green hydrogen, creating local jobs and bolstering France’s energy independence.

 

Qair: A Leading Independent Renewable Energy company

With 30 years of expertise and operations in 20 countries, Qair is a pioneer in renewable energy, developing tailored solutions for territories. The group employs 600 people across Europe and targets 3 GW of capacity by 2027.

«Our invitation to the Élysée Palace is a recognition of our commitment to 100% renewable and sovereign energy,» said Louis Blanchard. «Through innovative, renewable energy solutions such as Eolmed and Hyd’Occ, we are turning national ambition into tangible progress and helping industries choose France.»

Key Data

1,7  GW
Capacity in operation or construction
3  GW
Target capacity for 2027
600  employees
In Europe
30  years
Expertise

About Qair

Qair is an independent renewable energy company developing, financing, building, and operating solar, wind, waste-to-energy, storage and green hydrogen production assets.

With 1.7 GW of capacity in operation or construction, the Group’s 780 employees are developing a portfolio pipeline of 34 GW in 20 countries across Europe, Latin America and Africa. Our ambition is to become an independent leader in responsible energy.

For media inquiries, please contact:

Follow us on Linkedin Follow us on Youtube Get emails alerts