Feriana

Located in the town of Feriana, within Tunisia’s Kasserine Governorate, this project encompasses two renewable energy developments. The first project is fully owned by Qair, while the second is a joint venture between Qair and Mazarine Energy. Both involve a 25-year land lease and include infrastructure work, such as constructing an access road along an existing track and building a grid connection to the STEG substation, located 3 kilometers away. After construction, Qair will oversee the operations of both projects.

Key data

20 MWp

Installed capacity

2025

Commissioning